摘要
结合某工程实例,阐述了无粘结后张拉预应力混凝土施工技术在现浇框架梁柱中的应用及预应力分项工程质量验收方法。
In combination with an engineering practice, the application of the prestressed concrete construction technique with unbonded post-tensioning method in the east-in-place framed beam-column and the quality acceptance of the prestress suhdivisional work are stated.
出处
《安徽建筑》
2006年第5期88-89,91,共3页
Anhui Architecture
关键词
无粘结预应力混凝土结构
施工技术
质量验收
prestressed concrete structure with unbonded post-tensioning method
construction technique, quality acceptance