摘要
通过在施工区域做降水实验,确定降水具体方案,并通过该方案在该区域其他工程项目上的运用取得了较好效果。
After the water drainage experiment on the construction area, the drainage scheme is determined. The scheme has also been applied to the other projects in this area and achieved good results.
出处
《安徽建筑》
2006年第5期120-121,共2页
Anhui Architecture
关键词
降水
深井井点
冷却塔施工
water drainage
deep well
cooling tower construction