1Xue Xiaolong, Shen Qiping,2005,An agentbased framework for supply chain coordination in construction, Automation in Construction, 14,413 - 430.
2Ruben Vrijhoef, Lauri Koskela, 2000, The four roles of supply chain management in construction,European Journal of Purchasing & Supply Management, 6,169- 178.
3Alintola Akintoye,George McIntosh,Eamon Fitzgerald, 2000, A surey of supply chain collabration managemet in the UK construction industry, European Journal of Purchasing & Supply Management,6,159- 168.
6Wang Shu wang, Zheng ren, Liu zhifeng,Liu guangfu,2003,Construction of Dynamic Green Supply Chain Based on Agent,Electronics and the Environment, IEEE International Symposium on 19-22 May, 30-35.
7Shen. L. Y., 2002, Implementation of environmental management in the Hong Kong Construction Industry, International Journal of Project Management, 20,535- 543.
8Shu-Li Huang, Wan-Lin Hsu, 2003,Materials flow analysis and emergy evaluation of Taipei's urban construction, Landscape and Urban Planning,63,61-74.
9Handfield R B., 1996,Green Supply Chain. Best Practices From the Furniture Industry, Processings Annual Meeting of the Decision Sciences institute, 3,1295 - 1297.
10Joseph Sarkis, 2003, A strategic decision framework for green supply chain management, Journal of Cleaner Production, 11,397- 409.
4Koskela L. Application of the new production philosophy to construction (Tech.Report72) [R].CIFE:Stanford Univ. ,CA, 1992.
5Bertelsen S. Construction Logistics Ⅰ and Ⅱ ,Materials-management in the Construction Process (in Danish)[M].Boligministeriet,Byggeog Boligstyrelsen, K Benhavn,1993.
6O' Brien WJ,Fischer M A.Construction Supply-chain Management:a Research Framework [A]. Proceedings of Civil-COMP'93, IT for Civil and Structural Engineers, The Third International Conference on the Application of Artificial Intelligence to Civil and Structural Engineers [C]. Edinburgh: Scotland, 1993.61-64.
7Ekambaram P.,Mohan M.K.,Xue Qing Zhang. Reforging Construction Supply Chains:a Source Selection Perspective [J]. European Journal of Purchasing & Supply Management,2001(7) : 165-178.
8Vrijhoef R., Kosekela L. The Four Roles of Supply Chain Management in Construction [J]. European Journal of Purchasing & Supply Management, 2000(6) : 169-178.
9Malik M A Khalfan,Chimay J Anumba,Carys E Sieminiuch,Murray A Sinclair. Readiness Assessment of the Constructing Supply Chain for Concurrent Engineering [J]. European Journal of Purchasing & Supply Management,2001(7) : 141-153.