本文介绍了江阴利港发电厂三期扩建工程的试桩情况及试验结果。试桩时,分别对慢速维持荷载法和美国ASTM法以及单循环加荷法和多循环加荷法进行了比较,可供试桩工程参考。
This paper introduces the description and result of pile test on Jiangyin Ligang Power Plant project. The pile tests including six piles under axial compressive load with slow speed loading methed and ASTM method,and four piles under lateral load with single cycle loading method and multiple cycle loading method. It have been applied to different method. It have been applied to different method of pile test for comparison,and the result can be used for reference in test pile works.
出处
《结构工程师》
1996年第3期28-32,共5页
Structural Engineers
关键词
桩
极限承载力
桩端阻力
桩端位移
pile
ultimate bearing capacity
end resistance
end displacement