基于遗传算法的多设计任务规划研究

Research on GA-based multiple design tasks planning
下载PDF
导出
摘要 在满足产品设计周期的条件下,以完成所有设计任务的时间最短为规划目标,提出并构建了一种面向多设计任务的规划模型。在该规划模型中,设计节点的并发性和任务设计的并行性被考虑。针对该任务规划模型的解算,则采用遗传算法(GeneticAlgorithm,GA)实现。最后,采用具体的实例来验证该任务规划模型及算法的可行性。 Under the condition of satisfying the lifecycle of product design, taking the minimal times of all design tasks as the planning objective, a planning model for multiple design tasks is presented and established. In this scheduling model, the concurrent characteristic of design nodes and parallel characteristic of design tasks are considered. In order to resolve this planning model, the genetic algorithm (GA) is adopted. Finally, a numerical example is conducted to demonstrate the feasibility of the presented planning model and algorithm.
出处 《制造业自动化》 北大核心 2006年第10期25-29,共5页 Manufacturing Automation
基金 教育部新世纪优秀人才支持计划(NCET-04-0928)
关键词 任务规划 遗传算法 计划评审技术 甘特图 task schedule genetic algorithm PERT gantt chart
  • 相关文献

参考文献5

  • 1JIAO L M,KHOO L P,CHEN C H.An intelligent concur rent design task planner for manufacturing systems[J].Adv Manuf Technol,2004,23:672-681.
  • 2LUH P B,LIU F,MOSER B.Scheduling of design projects with uncertain number of iterations[J].European Journal of Operational Research,1999,113:575-592.
  • 3黄洪钟,李丽,刘伟.并行工程中设计任务的动态调度[J].机械工程学报,2002,38(z1):164-167. 被引量:12
  • 4任东锋,方宗德.并行设计中任务调度问题的研究[J].计算机集成制造系统,2005,11(1):32-38. 被引量:18
  • 5玄光男 程润伟.遗传算法与工程优化[M].北京:清华大学出版社,2004..

二级参考文献8

  • 1[1]Blazewicz J, Leastra J K, Kan A H G R. Scheduling subject to resource constraints:classification and complexity. Discrete Applied Mathematics, 1983, 5:11~24
  • 2[2]Downlatshahi S, Ashok M S. Design optimization in concurrent engineering:a team approach. Concurrent Engineering-Research and Applications, 1997, 5:145~154
  • 3[3]Peter B L, Feng Liu, Bryan M. Scheduling of design projects with uncertain number of iterations. European Journal of Operational Research, 1999, 113:575~592
  • 4[4]Todd D S, Sen P. Distributed task scheduling and allocation using genetic algorithms. Computers & Industrial Engineering, 1999, 37:47~50
  • 5[5]Nicoletti S, Nicolo F. A concurrent engineering decision model:Management of the project activities information flows. Production Economics, 1998, 54:115~127
  • 6WILEY V. Optimization analysis for design and planning formulation-project programs[J]. European Journal of Operational Research, 1998,107(2) : 492- 506.
  • 7孙晓斌,肖人彬,李莉.并行设计中任务量与时间模型的探讨[J].中国机械工程,1999,10(2):207-210. 被引量:10
  • 8曹健,张友良,赵海燕,黄双喜.并行工程中设计任务的动态分配方法研究[J].计算机辅助设计与图形学学报,1999,11(2):168-171. 被引量:14

共引文献421

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部