软土地基上修建高路堤桥台时,软土层会因压密下沉产生塑性流动,使桥台桩基承受附加水平压力而发生前移,若对此不采取有效措施,常会引发严重的桥台病害等问题,综合分析了软基桥台前移的成因,探讨了软土路堤影响桥台桩基的几个关键问题,对防止桥台前移的一般工程处理办法进行了评述,提出了控制深厚软土地基高桥台前移综合处理措施的设计计算步骤,这对软基桥台的设计、施工有一定的参考价值。
When a high embankment on soft clay forms an approach to a piled bridge abutment, time - dependent movements within the clay may produce significant lateral loading and deflection of the piles. The internal and external experiences and lessons indicate it would lead to serious diseases failure of the abutment and embankment if the effective measures were not taken. The causes of the lateral movement of the abutments on soft clay are analyzed and the key consequences and effects are discussed. The general measures which are provided against the lateral movement of the abutments are summarized. Two new measures which might deal with the lateral movement of the high abutments on thick soft clay are presented.
出处
《铁道科学与工程学报》
CAS
CSCD
北大核心
2006年第4期54-58,共5页
Journal of Railway Science and Engineering
基金
铁路科技研究开发计划项目(2003G005)
关键词
软土
高桥台
附加水平力
桥台前移
技术措施
soft clay
high bridge abutment
additional horizontal stress
lateral movement of bridge abutment