摘要 基于目前多种管理软件中工艺状态描述方法的优缺点,针对企业因订单改变、物料供应短缺、加工过程中机器故障等原因造成物料加工中断,导致生产计划滚动和重排而出现停滞的现象,提出了基于16进制的物料工艺状态描述方法。通过建立物料工艺状态矢量,用该矢量确定工艺状态值,准确描述物料的工艺状态信息,实现了一道工序在加工过程中的中间状态描述,解决了因出现异常现象引起的生产计划重排的停滞问题,使车间生产计划的实时滚动达到准确可行。通过将物料工艺状态矢量进行分块处理,引入物料工艺状态域和物料域工艺状态值的概念,满足了实际生产中对物料工艺状态信息的完整描述,为企业科学管理物料和实时滚动车间作业计划提供了有效的技术手段。 To improve low flexibility of accurate process replanning induced by various uncertainties such as uncertain customer orders,delayed supplies, machine breakdown and absenteeism, a descriptive method of material process state based on hex system was put forward after analyzing the advantages and disadvantages of various descriptive methods of material process state in lots of management software. By defining material process state vector, the material process state was described accurately with the value corresponding to the vector. In this way, an unfinished process could be described precisely and thus the low degree flexibility of accurate process replanning resulted from various uncertainties was improved greatly. Material process state vector was divided into several parts by defining material process state domain and its corresponding value. Consequently, a complete description of material process state, which could be applied to manufacturing process, was achieved. This description of material process state has provided an effective way to manage material and replan job--shop scheme.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2006年第7期1002-1006,共5页 Computer Integrated Manufacturing Systems
基金 国家863/CIMS主题资助项目(2003AA415830)。~~
关键词 作业计划 物料 工艺状态 16进制 process planning material process state hex system
  • 相关文献

参考文献8

二级参考文献19

  • 1王家.生产调度的一种启发式规则[J].清华大学学报(自然科学版),1995,35(5):27-32. 被引量:10
  • 2马士华,陈荣秋,黎志成.基于MRP和OPT的集成计划与控制系统[J].中国机械工程,1995,6(6):11-13. 被引量:20
  • 3张佐,谢东,吴秋峰,韩曾晋.一般生产调度问题的统一结构[J].清华大学学报(自然科学版),1997,37(4):110-113. 被引量:8
  • 4ZHANG H C,MALLUR S.An integrated model of process planning and production scheduling[J].International Journal of Computer Integrated Manufacturing,1994,7(6):356-364.
  • 5IWATA K,FUKUDA Y.A new proposal of dynamic process planning in machine shop[A].Proceedings of CIRP International Workshop on Computer Aided Process Planning (CAPP)[C].Germany Hanover University,1989.73-78.
  • 6CHANG H C,CHEN F F.A dynamic programming based process planning selection strategy considering utilization of machines[J].International Journal of Advanced Manufacturing Technology,2002,(19):97-105.
  • 7JOO J,PARK S,CHO H.Adaptive and dynamic process planning using neural networks[J].International Journal of Production Research,2001,39(13):2923-2936.
  • 8MATURANA F,GU P,NAUMANN A.Object-oriented job-shop scheduling using genetic algorithms[J].Computer in Industry,1997,(32):281-29.
  • 9邓超,李培根,蔡力钢,段正澄.基于多工艺方案的车间作业计划方法研究[J].华中理工大学学报,1997,25(3):14-15. 被引量:5
  • 10Deng Chao,International Conference on Manufacturing Automation,1997年

共引文献28

同被引文献3

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部