以洛湛线机电设备配置为例,从电力设备、通风设备、挖装运设备、喷浆衬砌、辅助设备的配置五方面介绍了隧道开挖机电设备的配置方法,为今后类似情况的配置提供借鉴。
Taking the configuration of dectromechanical devices in Luo-Zhan line, the author introduces the configuration method of electromechanical devices in tunnd excavation from dectric equipment, ventilating equipment, carrier-loader, guniting lining and configuration of accessory, which to offer a reference for similar configuration.