期刊文献+

施工与管理研究的拓展——初论施工工效学 被引量:5

Extension of Construction and Management Research——the Preliminary Discussion of Construction Ergonomics
原文传递
导出
摘要 把工效学的基本原理引入建筑施工及其管理的研究中,将施工系统分解为施工主体、施工条件、施工环境和施工对象,并构建起施工的人-机-环境工效学系统,提出施工工效学人的发展观、要素互适观、安全约束下的系统绩效观思维原理,初步构建了由施工动作和施工活动元组成的研究层次体系和若干研究方向组成的研究方向体系。 By introducing the fundamental principles of ergonomics, construction system is broken into governing body of construction, construction conditions, construction environment, subject of construction, and construction ergonomic system that consists of human, machine and environment is structured. Three conception principles of Construction Ergonomics, which are people's perfect development, factors fit in with each other and systematical performance subject to safety, are given. Level systems of research which includes two standard research units- construction motions and unit-activity of construction, and study fields system are suggested.
作者 杨德钦
出处 《建筑经济》 北大核心 2006年第10期54-57,共4页 Construction Economy
关键词 施工工效学 建筑施工与管理 工效学 construction ergonomics construction and management ergonomics
  • 相关文献

参考文献5

  • 1金维兴,张文艳.中国建筑业支柱产业地位分析[J].建筑经济,2001(8):6-9. 被引量:38
  • 2方东平,黄新宇,黄志伟.建筑安全管理研究的现状与展望[J].安全与环境学报,2001,1(2):25-32. 被引量:117
  • 3顾宝德.工效学基础[M].哈尔滨:黑龙江科技出版社.1981.
  • 4Human Factors and Ergonomics Society. (1998).HFES strategic plan[S]. Human Factors and Ergonomics Society Directory and Yearbook, 1998-1999, 388. Santa Monica, California: Human Factors and Ergonomics Society.
  • 5International Ergonomics Association (IEA) (Ed.).(2000). The Discipline of Ergonomics-Definitions. Http://www. iea.cc/ergonomics.

二级参考文献60

  • 1Samelson N M and Levitt R E. Owner's guidelines for selecting safe contractors[J]. Journal of Construction Division, 1982,108(4): 617~623
  • 2Hinze J W and Raboud P. Safety on large building construction projects[J]. Journal of Construction Engineering and Management, 1988, 114(2): 286~293
  • 3Hinze J W and Figone L A. Subcontractor safety as influenced by general contractors on small and medium sized projects[R].Source Document 38, Construction Industry Inst, Univ of Washington, Seattle, Wash, 1988
  • 4Hinze J W and Figone L A. Subcontractor safety as influenced by general contractors on large projects[R]. Source Document 39, Construction Industry Inst, Univ of Washington, Seattle, Wash, 1988
  • 5Liska R W, Goodloe D and Sen R. Zero accident techniques[R]. Source Document 86, Construction Industry Inst, Univ of Texas at Austin, Tex, 1993
  • 6Hatush Z and Skitmore M. Criteria for contractor selection [J]. Construction Management & Economics, 1997, 15 (1): 19~ 38
  • 7Hong Kong Housing Authority. Performance Assessment Scoring System Manual[S], 1990
  • 8Barrie D S and Paulson B C. Professional Construction Management[M]. 3rd ed. New York: McGraw-Hill Book Co. , 1992
  • 9Paulson B C. Safety program for volunteer-based construction projects[A]. In: Coble R, Hinze J and Haupt T C, eds. Construction Safety and Health Management[M]. New Jersey: Prentice Hall, 2000. 1~22
  • 10Coble R J and Elliott B R. Scheduling for construction safety[A]. In: Coble R, Hinze J, Haupt T C, eds. Construction Safety and Health Management[M]. New Jersey: Prentice Hall, 2000. 43~58

共引文献154

同被引文献18

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部