期刊文献+

机场滑行道下箱涵顶进长大管棚施工方案 被引量:5

Large Scale Piperoof Construction Scheme for Frame Structure Jacking Under L-type Air Runway in Beijing International Airport
下载PDF
导出
摘要 详细介绍了直径为325 mm、长达142 m的长大管棚施工方案,内容包括长大管棚打设方法、施工工艺、流程、工序、设备、技术要求和施工组织等。所介绍的方案成功应用于实际工程,取得了良好的经济效益和社会效益,也为同类工程提供了实践经验。 The construction scheme of large scale piperoof with 6325 diameter and 142 m length is introduced in detail, including such contents as large scale piperoof drill and installation, construction technique and procedure, construction equipment and organization. The scheme described in the paper has been applied in real engineering practice and has got good economic and social benefits, and supplies a good reference to similar projects.
出处 《铁道建筑技术》 2006年第5期47-49,共3页 Railway Construction Technology
关键词 箱涵顶进 长大管棚 施工方案 frame structure large scale piperoof construction scheme
  • 相关文献

参考文献2

  • 1余彬泉,陈传灿.顶涵施工技术.上海:人民交通出版社,1997
  • 2冯卫星 王克丽.地道桥设计与施工[M].石家庄:河北科学技术出版社,2002..

共引文献1

同被引文献20

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部