摘要
进度风险是新装备研制面临的重要风险之一,它与计划、技术等因素密切相关。该文分析了装备研制进度风险的影响因素,总结了网络计划技术在进度风险评估分析中的应用,并就如何进行风险控制进行了研究。
The schedule risk is an important risk during new equipment development, which correlates with plan technique and other factors. This paper analyzes the factors that influence the risk of equipment development schedule, summarizes the practice of net plan technique in schedule risk evaluation and discusses how to carry out the risk control.
出处
《船舶》
2006年第5期51-53,共3页
Ship & Boat
关键词
装备
研制进度
风险管理
评估
equipments development schedules risk managements evaluation