通过厦门一老市区的繁忙道路上新建一座人行地道的设计及施工,阐述地道分节段预制及吊装的施工工艺。该地道的建设是对城市地道建设中大构件预制吊装施工工艺的有益尝试,并缩短了施工工期,获得社会效益。
The subway's separated prefabricated and hoisting technique has been expounded through a design and construction of pedestrian subway across busy urban blocks in Xiamen. The construction of the subway is a beneficial test for large component prefabricated and hoisting construction technique of urban subway, and it also shortens the construction time and wins the social benefit.