摘要
横泉水库是山西省多年来采用塑性砼防渗墙面积和高度最大的一座中型水库。着重介绍了塑性砼防渗墙的施工技术,包括施工方法、施工工艺、施工质量控制等内容。
The Hengquan Reservoir is a middle-sized reservoir with the highest height and largest area adopting the plastic concrete cut-off wall in Shanxi Province for many years. This paper emphatically introduces the construction technique of the plastic concrete cut-off wall, which includes the construction methods, construction processes and the quality control measures.
出处
《科技情报开发与经济》
2006年第22期276-277,共2页
Sci-Tech Information Development & Economy
关键词
塑性砼防渗墙
施工技术
质量控制
横泉水库
plastic concrete cut-off wall
construction technique
quality control
Hengquan Reservoir