建立了水电站厂内自动发电控制的数学模型,提出一种针对多喷嘴水斗式水轮机组的自动发电控制模型求解方法。以仁宗海水库电站2台6喷嘴水斗式水轮机组为例,通过将多喷嘴水斗式水轮机的不同运行方式个体化,并结合动态规划法求解,水电站可确定出最优经济运行方案。
A mathematical model of automatic generation control for hydroelectric station is established, and a solution method to AGC mathematical model on multi-nozzle scoop-type turbines is proposed. Through individual the different operating modes of multi-nozzle scoop-type turbine and combined dynamic programming method, it can determine the optimal economic operation scheme for hydroelectric station.
出处
《水力发电》
北大核心
2006年第10期66-67,105,共3页
Water Power
基金
四川省重点学科资助项目(SZD412)
关键词
多喷嘴水斗式水轮机组
自动发电控制
动态规划
经济运行
multl-nozzle scoop-type turbines
automatic generation control
dynamic programming
economic operation