基于数据驱动的瀑布沟水电站大坝施工仿真系统 被引量:1

Dam Construction Simulation System of Pubugou Hydropower Station based on Data driving
下载PDF
导出
摘要 瀑布沟水电站大坝施工工序繁多,仅依靠静态的进度计划图表无法快速准确地把握施工过程的全貌。应用数据交互技术和虚拟现实技术实现的具有数据驱动的瀑布沟水电站大坝施工三维仿真系统不仅图形表现力极强,还可以实现人机交互,为全面快速掌握施工全过程提供了有力的分析工具。 A three-dimensional dam building simulation system of Pubugou hydropower station based on data driving is presented in this paper. The system uses data exchange and virtual reality techniques. The data of schedule in dam building is picked up and transformed into simulation system according to the fixed format. The nearby topography and geomorphy in the dam are simulated by virtual reality. The dynamic emulation of dam construction in progress is realized. The effect of progress in dam building site can be seen on the basis of different schedule and duration.
出处 《水力发电》 北大核心 2006年第10期86-88,共3页 Water Power
关键词 大坝 施工 数据驱动 虚拟现实技术 仿真系统 瀑布沟水电站 dam construction data driving virtual reality techniques simulation systiom Pubugou Hydropower Station
  • 相关文献

参考文献5

二级参考文献26

  • 1陈述彭.地理系统导论[M].北京:科学出版社,2001..
  • 2Huang R Y,Halpin D W.Visual construction operations simulation-The DISCO approach [J].Journal of Microcomputers in Civil Engineering,1994,9(6):175-184.
  • 3Liu L Y,Ioannou P G.Graphical resource-based object-oriented simulation for construction process planning [C]//Proceedings of 5th International conference on Computing in Civil and Building Engineering.New York,ASCE,1993.1390-1397.
  • 4Ioannou P G,and Martinez J C.Animation of complex construction simulation models [C]//Proceedings of 3rd Congress on Computing in Civil Engineering.New York,ASCE,1996.620-626.
  • 5Kamat V R,Martinez J C.Visualizing simulated construction operations in 3D [J].Journal of Computing in Civil Engineering,2001,15(4):329-337.
  • 6McKinney K,Kim J,Fischer M,Howard C.Interactive 4D-CAD[C].Proceedings,3rd Congress on Computing in Civil Engineering.New York,ASCE,1996.383-389.
  • 7AbouRizk S,Mather K.Simplifying simulation modeling through integration with 3D CAD [J].Journal of Construction Engineering and Management,ASCE,2000,126(6):475-483.
  • 8Koo B,Fischer M.Feasibility study of 4D CAD in commercial construction [J].Journal of Construction Engineering and Management,ASCE,2000,126(4):251-260.
  • 9Halpin D W.CYCLONE-Method for modeling job site processes [J].Journal of Construction Division,ASCE,1977,103(3):489-499.
  • 10刘东海.工程可视化辅助设计理论方法及其应用[D]:博士学位论文.天津:天津大学,2003.

共引文献68

同被引文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部