摘要
结合大同第二发电厂二期2×600 MW机组的调试,对一种基于新的直接能量平衡协调控制机理及其控制回路进行了分析。针对机组在协调控制方式下不同工况所存在的问题,对协调控制方案进行了优化,经实际应用效果良好。
Combined with debugging work of 2×600 MW units in second-phase project of Datong Power Plant no.2,the mechanism and control loop of a new coordinated control system based on direct energy balance(DEB) have been analysed.Directing against the problems existing in different operating conditions of the unit under coordinated control mode,the said coordinated control system has been optimized,and good effectiveness being obtained through practical application.