摘要
结合西南某水电站的工程概况及地质条件,分析了三大主厂房开挖过程中出现的工程地质问题以及产生的原因,介绍了预防和保护措施,对类似工程具有一定的参考价值。
Combined with the project general situation and geology condition of one hydroelectric station southwest, it analyzes the project geology problems and the reason happened in excavation procedure of the three main work shops, and introduces the precautionary and protects measures, give a reference to similar project.
出处
《山西建筑》
2006年第22期118-119,共2页
Shanxi Architecture
关键词
主洞室
滑移变形
围岩稳定
开挖
main cavern grotto, sliding deformation, coffer dana stabilize, excavation