某水电站地下洞室群开挖中的工程地质问题 被引量:1

The project geology problems of one hydroelectric station in under ground cavern grotto group excavation procedure
下载PDF
导出
摘要 结合西南某水电站的工程概况及地质条件,分析了三大主厂房开挖过程中出现的工程地质问题以及产生的原因,介绍了预防和保护措施,对类似工程具有一定的参考价值。 Combined with the project general situation and geology condition of one hydroelectric station southwest, it analyzes the project geology problems and the reason happened in excavation procedure of the three main work shops, and introduces the precautionary and protects measures, give a reference to similar project.
作者 刘欣 贺鹏
出处 《山西建筑》 2006年第22期118-119,共2页 Shanxi Architecture
关键词 主洞室 滑移变形 围岩稳定 开挖 main cavern grotto, sliding deformation, coffer dana stabilize, excavation
  • 相关文献

参考文献3

二级参考文献3

  • 1徐光黎.岩石地下工程岩体质量评价综述[J].工程地质,1999,(3):14-18.
  • 2.3D-σ用户手册[M].日本软脑株式会社,1997..
  • 3Unwedge Users Guide, 3D visualization of potentially unstable wedges in the rock surrounding underground excavations and calculation of factors of safety and support requirements for these wedges, 1992-1999 Rocscience, Inc.

共引文献4

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部