摘要
结合阳光购物广场项目的工程地质概况,介绍了桩基施工中的后压浆施工工艺,着重分析了注浆量与土层地质、成桩工艺的关系,总结了后压浆施工的工程效果。
Combined with the geological survey of the Sunshine Shopping Square project, it introduces the construction technique ot rear mud jacking in the pile foundation construction, analyzes the relation between the injected dosage and geology of the soil layer, pile-forming emphatically, and generalizes the project effectiveness of the rear mud jacking, inject construction.
出处
《山西建筑》
2006年第22期134-135,共2页
Shanxi Architecture
关键词
灌注桩
后压浆
注浆
成孔
driven cast-in-place pile, rear mud jacking, inject, pore-creating