摘要
结合广州地铁五号线工程概况及地质条件,从连续墙的成槽施工、泥浆的制造和使用、浇筑水下混凝土三方面介绍了该工程主体围护结构的关键环节的施工控制措施,从而有效地保证了成槽质量和周边建筑物的安全。
Combined with the underground 5 # line project survey and geological conditions in Guangzhou city, it introduces the key segments construction control measures of the principal exterior-protected construction in this project from three aspects of canal construction of serial wall, the manufacture and use of mud fluid, casting underwater concrete, which will assure the canal quality and the safety of the peripheral buildings effectively.
出处
《山西建筑》
2006年第22期240-241,共2页
Shanxi Architecture
关键词
连续墙
泥浆
主体围护结构
serial wall, mud fluid, principal exterior-protected construction