摘要
宽尾墩与消力池组成的联合消能形式具有消能率高的特点,但也存在着消力池内的压强分布不均匀,最大冲击压强及动水压强集中度过大的问题。本文结合功果桥水电站整体水工模型试验,提出了一种新型的XT型宽尾墩,对于改善消力池底板上的压强分布,增强底板的稳定具有重要意义。
Though the energy dissipation efficiency associated of flaring gate piers with stilling basin is higher, there still are some drawbacks, such as non-uniform pressure distribution and over concentration of hydrodynamic pressure in stilling basin. A new XT type of flaring gate piers is introduced in the paper, it was shown by hydraulic model study that it had an outstanding effect of improving pressure intensity distribution in stilling basin.
出处
《西北水力发电》
2006年第3期30-33,共4页
Journal of Northwest Hydroelectric Power
关键词
Y型宽尾墩
XT型宽尾墩
消力池
动水压强集中度
最大冲击压强
Y Type of Flaring Gate Piers
XT Type Of Flaring Gate Piers
Stilling Basin
pressuredistribution
impact pressure