黑河水库为西安市城市供水的水源地,在满足城市供水为主的任务要求外,兼顾灌溉、发电等任务。同时又与石头河供水渠道汇流,满足西安市的用水需求,因此引水系统较为繁杂。通过对引水系统水工模型试验时存在的问题的妥善解决,并采取一定的工程措施,取得了较好的运用效果。
T tion, power erate with t complex. T engineering he heihe reservoir is the source project for water supply to Xi'an city, as well as for irrigageneration and so on. In order to meet the water demand of Xi'an city, it should be coophe diversion canal from Shitouhe Reservoir, so that the water diversion system is rather he problems detected from hydraulic model experiments were solved rationally by means of measures, the water work achieved a better effect.