摘要
论述了采用BOT方式进行电力项目建设的主要风险及规避措施,规避措施主要有三个方面:重视政府作用、合理分担风险及按市场规律办事等。
The risk and the avoiding measures were studied by using the way of BOT to construct the electricity project, and the avoiding measures has three main aspects, paying much attention to the government, sharing the risk reasonablely and doing everything on the basis of market discipline.
出处
《西北水力发电》
2006年第3期97-99,共3页
Journal of Northwest Hydroelectric Power