摘要
对西河缓洪库坝基采空区的成因、现状及危险进行了分析,并提出全充填压力注浆处理措施。
The formation cause, present status and risk of the exhausted area in the foundation of Xihe flood detention reservoir were analyzed, and the treatment measures of pressure injection with full stuffing were put forward.
出处
《西北水力发电》
2006年第4期29-31,共3页
Journal of Northwest Hydroelectric Power
关键词
坝基
煤矿采空区
裂缝
全充填压力注浆
dam foundation
exhausted area of mining
crack
pressure injection with full stuffing