摘要
着重介绍了某电厂150MW机组调试过程中多次出现的典型故障处理的情况。此类故障比较新颖,具有一定的代表性,对于今后同类型机组的安装、调试、运行以及检修,都有重要的借鉴意义。
Elimination details of several typical faults ocurred in the commissioning course of one 150MW unit are described here. These problems are new and representative, which could be used for references to installation, commissioning, operation and overhaul of the similar turbo-generator units afterward.