摘要 建设北京地铁5号线崇文门站需下穿既有地铁2号线崇文门-北京站区间隧道,为保证既有地下铁道正常运营和地下结构的安全,需严格控制车站施工所引起的地层位移。根据崇文门站的暗挖施工的监测资料和既有区间结构的实际情况,计算和分析下穿情况下2号线区间结构的受力安全状态。 To construct Chongwenmen Station of Beijing metro line No. 5, it should under - traverse the existing transit tunnel between Beijing Station and Chongwenmen Station of metro line No. 2. To maintain the normal operation of line No. 2 and the security of the existing tunnel structure, it is necessary to strictly control the displacements of the ground caused by the construction of Chongwenmen Station. The security of the existing tunnel structure is calculated and analyzed in this paper according to the monitoring data of the station during construction and the conditions of the existing transit tunnel structure.
作者 贾永刚
出处 《都市快轨交通》 2006年第5期62-65,共4页 Urban Rapid Rail Transit
基金 北京市科委重大项目(D0604003040221)
关键词 北京地铁5号线 既有区间结构 地层位移 监测资料 Beijing metro line No. 5 existing transit tunnel structure displacements of ground monitoring data
  • 相关文献

参考文献2

  • 1[2]李廉锟.结构力学:上册[M].3版.北京:高等教育出版社,2002.
  • 2[3]孙训方,方孝淑,关来泰.材料力学:上册[M].3版.北京:高等教育出版社,2001.

同被引文献35

引证文献6

二级引证文献157

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部