期刊文献+

某在建高层建筑框架柱节点拆除支撑方案设计

The design of support project in dismantling the frame structure joints of an abuilding tall building
下载PDF
导出
摘要 某在建高层建筑由于施工问题造成其中一楼层部分框架节点混凝土强度达不到设计要求,经各方研究决定拆除节点区混凝土,由于该楼层上部已施工有五层,必须采取临时支撑措施,确保上部结构的安全,本文对支撑方案的计算、构造、实施及节点区混凝土的恢复进行了总结,供同行参考。 In an abuilding tall building, because of the construction reason, some frame structure joints in a floor whose concrete intensity didnt satisfy the design demand. These joints had to be dismantled. But there were five floors had been constructed, so it should take temporary support to assure the safe of structure. This article sums up the computing, construction and building of the support project and introduced the recover of the joint's concrete. It can provide some references to structure engineers.
作者 肖伟
出处 《福建建筑》 2006年第6期64-65,68,共3页 Fujian Architecture & Construction
关键词 框架节点 支撑 拆除 frame structure joint, support, dismantle
  • 相关文献

参考文献3

  • 1中华人民共和国国家标准,混凝土结构设计规范(GB50010—2002)
  • 2中华人民共和国国家标准,建筑工程施工质量验收统一标准(GB50300—2001)
  • 3中华人民共和国行业标准,回弹法检测?昆凝土抗压强度技术规范(JGJ/T23—2001)

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部