摘要
本文以排上大桥1#墩桩基施工为例,介绍了复杂地质情况下桩基终孔判断的控制方法,为类似工程提供参考经验。
Taking the 1# pier foundation construction of Paishang Bridge as example, the control methods to estimate the ending final hole of pier foundation under the complex geologic conditions are introduced in this paper. It provides reference for the similar projects.
出处
《福建建筑》
2006年第6期122-123,共2页
Fujian Architecture & Construction
关键词
桩基
终孔
判断
Pier foundation
Ending the final hole
Estimation