摘要
分析了电力工程管理信息的特点,介绍了电力工程信息管理平台数据模型设计的整体思路,并针对工期延误原因的关联分析、多任务进度汇总的权重模型训练等重点难点问题进行了详细阐述。结论是,电力工程管理数据挖掘必须有一定的数据体系支持,对非结构化数据信息的整理是关键。
Analyzed characteristic of electric project management information, the whole thinking about how to design a data model in power project information management platform is introduced, and some key points and difficulties are explained in detail, which include associated analysis on the reason of plan delay and the proportion model training of multitask schedule etc. The conclusion is that the data mining of power project management should be supported by a certain data system and what how to coordinate the unstructured data information would be the key,
出处
《广东输电与变电技术》
2006年第6期62-66,共5页
Guangdong Power Transmission Technology
关键词
电力工程管理
数据挖掘
模型设计
Power project management Data dig out Model design