期刊文献+

带约束的装配生产计划及其数据模型设计 被引量:1

Resources Constrained Assembling Production Planning and Its Structure Designing
下载PDF
导出
摘要 生产计划的制订是企业生产的重要一环,往往要受到来自企业内外多种因素的影响,生产计划系统是制造执行系统的一个重要组成部分。通过分析生产计划中零部件生产厂家、库存数量、设备生产能力、人员生产能力等约束和限制,从技术上构造了系统相关数据模型,并提出装配生产计划系统数据结构模型的设计方案。 The drafting of production planning is an important step in enterprise production and is affected by many factors from enterprise inside and outside. Production planning system is an important part in manufacturing execution system. After analyzing constraints and restrictions in production planning as the hardware making factories, parts storage amount, facility production ability, worker throughput, and etc., we constructed the system data modal technically and presented the designment scheme for assembling production planning system data siructure modal.
出处 《组合机床与自动化加工技术》 2006年第11期72-74,共3页 Modular Machine Tool & Automatic Manufacturing Technique
基金 国家自然科学基金项目(60275020) 上海市教委科研项目(04FB22) 上海海事大学重点学科建设项目(XL0101)
关键词 制造执行系统 生产计划 装配制造 资源受限 MES production planning assembling manufacturing resources constrained
  • 相关文献

参考文献5

二级参考文献11

  • 1Herroelen W, De Reyck B & Demeuleester E. Resource-constrained project scheduling-a survey of recent development [J]. Computer and Operation Research, 1998, 25 .. 279- 302.
  • 2Bedworth D D, Bailey J E. Integrated Production Control System[M]. John Wiley & Sons, 1982.
  • 3Blazewicz J J, Lenstra J K, Rinnooy Kan A H G. Scheduling projects subject to resource constraints., classification and complexity[J]. Discrete Applied Mathematics, 1983, 5..11-24.
  • 4Morton T E, Pentico D W. Heuristic Scheduling Systems[M]. John Wiley & Sons, Inc. , 1993.
  • 5Mendez C A, Henning G P. Continuous-time approach to short-term scheduling of resource-constrained multistage batch facilities [ J ]. Computers and Chemical Engineering, 2001(25) :701-711.
  • 6Musier R F H, Evans L B. Batch process management [ J ].Chemical Engineering Progress, 1990,87(6):66-77.
  • 7Aroio M, Sianesi A. A heuristic algorithm for master production generation with finish capacity and sequence dependent setups [J ]. International Journal of Production Research, 1993,31(3) :331-353.
  • 8Geoffrion A M, Marsten R E. Integer programming algorithms: a framework and state of art survey[J]. Management Science, 1972(18) :465-491.
  • 9Grossman I, Santibanez J. Applications of mixed-integer linear programming in process synthesis [ J ]. Computer chemical engineering, 1980(4) :205-214.
  • 10刘寅东.基于分布式专家系统的造船生产流程建立方法[J].中国造船,2003,44(4):1-4. 被引量:5

共引文献41

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部