结合华电国际邹县发电厂2×1 000 MW超超临界机组在设计及设备选型阶段的工程实践,对选用双列高压加热器布置方案或单列高压加热器布置方案的利弊进行了详细的论述,最终经比较选择了双列布置方案。
In connection with engineering work in the design and choice of matching equipment stage of Zhou County Power Plant's 2×1 000 MW ultra-supercritical sets, the advantages and disadvantages of singly and dually arrayed H.P. heaters are discussed in detail, with the final decision made for the dual juxtaposed version.
出处
《发电设备》
2006年第6期425-428,共4页
Power Equipment
关键词
能源与动力工程
超超临界机组
高压加热器
双列布置
方案选择
energy and power engineering
ultra-supercritical set
high pressure heater
dually arrayed