摘要
通过人工矿柱模型模拟试验,探讨了块石胶结充填的工艺过程及关键技术,分析了块石胶结充填体的强度机理,其试验结果已被铜陵新桥硫铁矿采用,也可供类似矿山借鉴.
On the basis of simulating test of artificial pillar, the filling process and key technologies of fragment cemented fill are discussed and mechanism of its strength analysed. The researching results have been adopted by Xinqiao Sulphide Iron Mine and can certainly be useful to other mines.
出处
《中南工业大学学报》
CSCD
1996年第6期651-654,共4页
Journal of Central South University of Technology(Natural Science)
基金
化学工业部重点资助