摘要
通过深圳和广州两个地铁车站机电设备安装及装修的监理工作实践,论述了地铁机电设备安装工程中对预留和预埋的工作质量的控制方案和措施。
This article focused on the plan and measure of quality control of pre-reserving and pre-burying in the installation engineering of electromechanical devices, which is based on the overseeing practice experiences of installing and repairing the electromechanical devices in Shenzhen and Guangzhou subway stations .
出处
《机电产品开发与创新》
2006年第5期26-27,共2页
Development & Innovation of Machinery & Electrical Products
关键词
机电设备
安装
预留(埋)
监理
控制
Electromechanical device
Installation
Pre-reserve
Overseeing
Quality control