摘要 润扬长江公路大桥是目前国内跨度最长的悬索桥,它的锚定基础也是目前国内最大的。其南锚定基础深基坑支护采用了钻孔灌注桩排桩加多道支撑挡土的排桩冻结法。介绍了对南锚碇基础基坑设计实施监测的全过程,得出了在冻结法中温度变化和冻胀力改变的规律。 Run-Yang Changjiang River Bridge is the longest suspension bridge and its anchor foundation is also the largest in China at present. New design and execution techniques are adopted in South Anchor Cushion Foundation Pit, namely freezing method of row piles. Its execution process of pit monitoring was introduced and some conclusions about temperature variation and frost boiling force were drawn under the freezing method construction.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2006年第B11期1653-1655,共3页 Chinese Journal of Geotechnical Engineering
关键词 排桩冻结法 冻胀 冻胀力 温度应力 freezing method of row piles frost boiling frost boiling force temperature stress
  • 相关文献

参考文献3

  • 1沙占发,中外集成继电器实用手册[M].北京:电子工业出版社.2005.
  • 2JGJ120—99,建筑基坑支护技术规范[S].
  • 3JGJ94-94.建筑桩基技术规范[S].[S].,..

共引文献826

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部