摘要 以某轨道交通深基坑工程中钻孔咬合桩挡土结构为背景工程,针对软土地区咬合桩成桩施工引起邻近建筑沉降这一工程问题,对咬合桩的施工工艺流程及其对地层的扰动机理进行了分析,并结合成桩过程中的工程实测资料对成桩施工引起的临近建筑沉降规律进行了分析,提出了减少咬合桩施工引起的沉降、保护周围房屋建筑的措施。 The secant piles were applied as retaining structures in deep excavation of a tunnel section with the cut and cover method. Construction of secant piles induced settlement of adjacent building in soft ground area. The procedure of the secant pile construction and its disturbance to the nearby ground were analyzed. Based on the analysis of measured data, the measures of reducing settlement induced by secant pile construction and protecting adjacent building were suggested.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2006年第B11期1806-1810,共5页 Chinese Journal of Geotechnical Engineering
关键词 深基坑工程 钻孔咬合桩 成桩施工 微扰动 沉降 deep excavation secant pile bore forming weak disturbance settlement
  • 相关文献

参考文献4

二级参考文献22

  • 1丘建金,张旷成.动力排水固结法在软基加固工程中的应用[J].工程勘察,1995,23(6):7-10. 被引量:50
  • 2.[Z].,2003-03..
  • 3.[Z].,2000—05-01..
  • 4方晓阳,基础工程手册,1997年
  • 5胡中雄,土力学与环境土工学,1997年
  • 6华东水利学院土力学教研室,土工原理与计算,1984年
  • 7Jessberger H L. Heavy tamping: theoretical and practical aspects. Soil mechanics and foundation engineering tenth international conference, Vol 3:695-699.
  • 8Matsui T. Behavior of elay on cyclic stress-strain history. Soil mechanics and foundation engineering tenth international conference,Vol 3.
  • 9王仁钟.强夯加固软土地基的动态测试与分析[A]..第一届全国地基处理学术讨论会论文[C].,1986..
  • 10Qian J H, et al. Dynamic consolidation for a clay foundation with sand package. 5th Int. Conf. on Numerical Methods in Geomechanics, 1985, Nagoya.

共引文献99

同被引文献99

引证文献18

二级引证文献93

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部