上海某深基坑工程风险识别与模糊评估 被引量:65

Construction risk identification and assessment of a deep foundation pit in Shanghai
下载PDF
导出
摘要 首先采用WBS与故障树法进行风险分析,建立风险清单,在此基础上采用模糊综合评判模型进行风险评估,得出基坑施工风险等级,为后来的风险应对提供参考依据。 To effectively assess the construction risk of a deep foundation pit in Shanghai, the WBS method was brought forward to break down the deep foundation pit, and the risk events of construction of the deep foundation pit were identified by use of the fault tree method. Finally, the construction risk degrees were evaluated and decided in accordance with fuzzy synthetic evaluation model. The results could be used in risk precaution.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2006年第B11期1912-1915,共4页 Chinese Journal of Geotechnical Engineering
关键词 深基坑工程 WBS法 故障树法 模糊综合评判模型 风险等级 deep foundation pit WBS method fault tree method fuzzy synthetic evaluation model risk degree
  • 相关文献

参考文献5

  • 1周红波,何锡兴,蒋建军,蔡来炳.软土地铁盾构法隧道工程风险识别与应对[J].现代隧道技术,2006,43(2):10-14. 被引量:16
  • 2周红波 赵林 邓绍伦.层次分析法在工程项目风险评估中的应用研究.土木工程学报,2005,:72-77.
  • 3毛儒.地下工程的风险管理[C].工程管理国际研讨会论文集,香港,2004.11,94~98
  • 4SHAO R Q. A multi-level fuzzy synthetic evaluation on investment programs in shipping[J]. Transportation Engineering, 2004,144(93):497 - 502.
  • 5苏燕.软土地层地下建筑物地震风险管理和保险研究[D].上海:同济大学,2004:85—105.

二级参考文献8

  • 1郭仲伟.风险分析与决策[M].北京:机械工业出版社,1986..
  • 2Einstein,H.H..Risk and risk analysis in rock engineering[J].Tunnelling and Underground Space Technology,1996,11 (2):141 ~ 155.
  • 3Sturk,R.,Olsson,L.and Johansson,J.Risk and decision analysis for large underground projects,as applied to the Stockholm ring road tuning[J].Tunnelling and Underground Space Technology,1996,11 (2):157 ~ 164.
  • 4Vik,E.A.,Sverdrup,L.,Kelley,A.etc.Experiences from environmental risk management of chemical grouting agents used during construction of the Romeriksporten tunnel[J].Tunnelling and Underground Space Technology,2000,15 (4):369 ~ 378.
  • 5Tonon,F.,Mammino,A.,Bernardini,A.Multiobjective optimization under uncertainty in tunneling:application to the design of tunnel support/reinforcement with case histories[J].Tunnelling and Underground Space Technology,2002,17:33 ~ 54.
  • 6Yoo,C.,Kim,J.H..A web -based tunneling-induced building/utility damages assessment system:TURISK[J].Tunnelling and Underground Space Technology,2003,18:497 ~ 511.
  • 7Eskesen,S.D.,Tengborg,P.,Kampann,J.,etc.Guidelines for tunnelling risk management:International Tunnelling Association,Working Group No.2[J].Tunnelling and Underground Space Technology,2004,19:217 ~237.
  • 8石礼安.地铁一号线工程[M].上海:上海科学技术出版社,1998.

共引文献28

同被引文献346

引证文献65

二级引证文献496

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部