摘要
朔黄铁路远期运输能力目标为2亿吨。文章研究了为实现这一目标,应采取的运输组织技术条件,包括列车开行对数、列车追踪间隔和列车载重三方面,并提出了相应对策。
The long term goal of the operation ability of Shuo - huang Railroad is 200 million tons. This article has analyzed, to achieve this goal, the technical transportation factors, including pairs of trains, intervals of trains and carrying capacity of trains and put forward some measures.
出处
《山西科技》
2006年第6期95-96,共2页
Shanxi Science and Technology
关键词
年运量
通过能力
列车追踪间隔
yearly transportation
traffic capacity
intervals of trains