摘要 Sulfur Exclusion System of Taichang Huaneng Electric Plant is the second phase project. Its annual demand of limestone amounts to 168 thousand tons. 282.1 thousand tons of waste gypsum will be conveyed to the plant by water with 500DWT barge. Since the dock for the first phase project is only used as the unloading oil berth in peak working time with one unloading vessel each month. Therefore, the plant has arranged the unloading and loading berth here for limestone and gypsum, maintaining the loading work of oil. Sulfur Exclusion System of Taichang Huaneng Electric Plant is the second phase project. Its annual demand of limestone amounts to 168 thousand tons. 282.1 thousand tons of waste gypsum will be conveyed to the plant by water with 500DWT barge. Since the dock for the first phase project is only used as the unloading oil berth in peak working time with one unloading vessel each month. Therefore, the plant has arranged the unloading and loading berth here for limestone and gypsum, maintaining the loading work of oil.
作者 林浩 艾菁
出处 《交通世界》 2006年第11A期82-83,20,共2页 Transpoworld
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部