期刊文献+

改进的逻辑框架法在黑河调水项目后评价中的应用 被引量:5

The Application of Improved LFA in Post-Evaluation under Heihe River Project
下载PDF
导出
摘要 改进的逻辑框架法可以用来分析项目诸多因素(包括投入、产出、目的、目标)之间的因果关系,并在水平方向说明规划或者初步设计指标数据与实际之间发生偏差的原因。将该方法运用于黑河中游5 a调水和3 a治理项目的效果后评价,方便直观地理清黑河调水项目中多种因素之间的关系,并取得较好的效果。 The improved LFA is used to analyse the causality among many factors such as input, output, aim and goal and also explain the reasons of the difference of the index datas between the programming or preliminary design and practice operation. In this paper this methord has been applied into the post - evaluation under the project of 5 years' water diversion and 3 years' controlling in the middle reaches of HeiHe River. By this way the complex relation can be seen conveniently directly and the result turn out to be good.
出处 《水利科技与经济》 2006年第10期675-677,共3页 Water Conservancy Science and Technology and Economy
关键词 改进的逻辑框架法 项目后评价 调水 效果评价 improved LFA post - evaluation water diversion effect evaluatio
  • 相关文献

同被引文献106

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部