柔性资源受限的多项目调度问题研究 被引量:5

Study of the Multi-project Scheduling Problem of Flexible Resource Constraint
下载PDF
导出
摘要 对国内外关于资源受限的多项目调度问题及柔性资源的现状进行研究,将资源受限的多项目调度问题中的资源拓展为柔性资源并展望了柔性资源受限的多项目调度问题的研究方向。 This paper studies the multi-project scheduling problem of the resource constraint and status quo of flexible resource, In multi-project scheduling problem,the resource constraint has been extended to that of flexible resource. Several directions have been put forward for further research on the multi-project scheduling problem of flexible resource constraint,
出处 《武汉理工大学学报(社会科学版)》 2006年第6期843-846,共4页 Journal of Wuhan University of Technology:Social Sciences Edition
基金 国家自然科学基金"面向复杂产品协同开发过程中的柔性资源智能优化调度研究"(60574070) 国家自然科学基金"企业柔性资源的最优分配与使用研究"(70271033)
关键词 资源受限 多项目调度 柔性资源 resource constraint multi-project scheduling flexible resource
  • 相关文献

参考文献22

  • 1Abdel-Hamid T K. A multi-project perspective of single-project dynamics [J]. Journal of Systems and Software,1991,22(3) :151-165.
  • 2Blazewicz J,Lenstra J K,and Rinnooy Kan A H G.Scheduling subject to resource constraint: Classification and complexity [J]. Discrete Applied Mathematics, 1983,5(1) : 11-24.
  • 3Patterson J H. Alternate methods of project scheduling with limited resources[J]. Naval Research Logistics Quarterly, 1973,20(4) : 767-784.
  • 4Patterson J H. Project scheduling; the effects of problem structure on heuristic performance[J]. Naval Research Logistics Quarterly, 1976,23 (1): 95-123.
  • 5Kurtulus I S and Davis EW. Multi project scheduling:Categorization of heuristie rules performance[J]. Management Science, 1982,28(2) : 161-172.
  • 6Prisker A A B,Watters L J and Wolfe P M, Multiproject scheduling with limited resources: A zeroone programming approach [J].Management Science,1969,16(1):93-108.
  • 7Drexl A. Scheduling of project networks by job assignment [ J ]. Management Science, 1991,37 ( 12 ):1590-1602.
  • 8Leaehmann K S and Robert C. Multi-project scheduling with explicit lateness costs[J]. IIE Transactions, 1993,25 (2) : 34-44.
  • 9Speranza M G and Vercellis C, Hierarchical models for multi-project and scheduling[J]. European Journal of Operational Research, 1993,64(2) : 312-325.
  • 10谈烨,仲伟俊,徐南荣.多种资源受限多项目排序问题的两层决策方法[J].系统工程理论与实践,2001,21(2):1-5. 被引量:19

二级参考文献4

  • 1仲伟俊,徐南荣.具有合作关系的多人递阶资源分配问题研究[J].系统工程理论与实践,1993,13(2):11-16. 被引量:4
  • 2Daniels R L,Mazzola J B. Flow Shop Scheduling with Resource Flexibility[J]. Operations Research, 1994,(42):504~522.
  • 3Daniels R L,Hoopes B J,Mazzola J B. Scheduling Parallel Manufacturing Cells with Resource Flexibility[J]. Management Science, 1996, (42):1260~1276.
  • 4Sigurdur Olafsson,Shi Leyuan. A Method for Scheduling in Parallel Manufacturing Systems with Flexible Resource[J].ⅡE Transactions, 2000, (32): 135~ 146.

共引文献23

同被引文献54

引证文献5

二级引证文献19