辽宁轮胎厂对动力站噪声分步进行治理,通过采取吸声、消声和隔声措施,使动力站的混响噪声得到了大幅度下降,达到了国家标准,取得了预期的效果。
The noise from the power station of Liaoning Tyre Factory has been controlled by stages. The reverberation noise has been greatly declined by taking measures of sound absorption, reduction and insulation, coming up to national standards and leading to satisfactory results.
出处
《化工环保》
CAS
CSCD
北大核心
1996年第4期210-213,共4页
Environmental Protection of Chemical Industry
关键词
噪声治理
消声
隔声
动力站