上海市上中路越江隧道南线隧道盾构出洞工程,使用14.87m泥水平衡盾构,出洞段穿越软弱淤泥,采用人工冻结法施工。文章对盾构出洞冻结法设计、施工、监测做了介绍。
The artificial soil freezing method has achieved good effect when it was applied to the outer well construction of Shangzhong Road tunnel project in Shanghai, which used huge mud balanced shield with diameter of 14.87 meters to go through the Huangpu River. The paper introduces the design, construction and monitor of shield tunneling freezing method.
出处
《施工技术》
CAS
北大核心
2006年第11期67-70,共4页
Construction Technology
关键词
隧道工程
冻结法
盾构
监测
tunnel engineering
artificial soil freezing method
shield
monitor