摘要
介绍广州地铁四号线5号道岔的设计理念、铺设方法、铺设施工工艺措施,并对5号道岔的铺设方法及采取的施工工艺措施进行了重点介绍。
In this article, the author introduces something about no. 5 rail switch used in Guangzhou Metro No. 4 Line, such as the design philosophy, layout method, layout construction technology, etc. The layout method and layout construction technology of no. 5 rail switch are emphasized.
出处
《施工技术》
CAS
北大核心
2006年第11期73-74,77,共3页
Construction Technology
关键词
地铁工程
道岔
铺设方法
施工工艺
措施
metro engineering
rail switch
layout method
construction technology
measure