对建设工程项目进行全过程投资控制,就是在工程项目建设的四个阶段——设计阶段、招投标阶段、施工阶段、竣工阶段对项目投资进行有效的管理和组织协调,充分体现技术先进条件下的经济合理性。
How to control the investment during the whole process of a construction item? Effective management , organization and coordination should be included in four stages of the construction item —— design,bidding,construction and completion. Economic reasonableness should be embodied sufficiently under the eondition of advanced technology.