从莫斯科大停电浅析发供电设备管理 被引量:1

Brief Analysis of the Electric Power Equipment Management Based on Major Interruption of Service in Moscow
下载PDF
导出
摘要 在分析2005年5月25日莫斯科大停电事故原因的基础上,提出电力企业要打破传统的管理模式,采用先进的管理手段,提高设备综合管理水平,构建发供电设备运行预警体系,促进安全生产。讨论了夏季高温峰荷时的设备管理,强调了大停电时备用发电设备的重要性。 Based upon the cause analysis for the blackout fault of May 25,2005 in Moscow, it has become a necessary trend to break traditional management mode, adoptting advanced management technology, such as computerized equipment life cycle cost management system, integrated GIS with on-line insulation monitoring system of electric equipment,and improving comprehensive management of electric equipment for safe production. Equipment management is discussed as summer load culminate .It is important of backup generators for critical sites during power outage.
出处 《江西电力职业技术学院学报》 CAS 2006年第4期15-16,共2页 Journal of Jiangxi Vocational and Technical College of Electricity
关键词 大面积停电 设备管理 寿命周期成本 major interruption of service equipment management life cycle cost
  • 相关文献

参考文献2

二级参考文献4

  • 1刘理峰,2000年重庆市电机工程学会学术年会,2000年
  • 2王明俊,配电系统自动化及其发展,1998年
  • 3陈俊,实用地理信息系统,1998年
  • 4王珊,数据库系统原理,1998年

共引文献11

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部