摘要
济钢目前的工程项目财务核算停留在简单的会计核算上,存在工程项目管理不集中、结算不及时、数据资料不能共享等问题,为此,需构建新的工程项目财务核算体系及开发新的核算软件。介绍了科目设置、项目投资管理、工程财物核算及固定资产转资等新体系的开发思路及构成情况、新的核算软件的功能和预期效果。
At present Jigang's engineering project financing checking is just staying in ordinary bookkeeping operation. That can't meet the need of development and investment because of its not concentration of engineering project management unshared data and out of time settlement. A new engineering project financing checking system and checking software are exploited with plenty of survey, study and argumentation. The exploiting clew for course arranging, item investment control, engineering property checking and changing to fixed assets are introduced, the functions and intended effect as well.
出处
《山东冶金》
CAS
2006年第5期56-58,共3页
Shandong Metallurgy
关键词
财务核算
工程项目
管理
开发思路
financing checking
engineering project
management
exploiting clew