采用滑动测微计监测坝基岩体卸荷变形 被引量:7

Analysis on the Deformation in the Foundation Excavation of Xiaowan High Arch Dam
下载PDF
导出
摘要 介绍了瑞士高精度滑动测微计监测沿钻孔中应变分布的原理和方法;采用滑动测微计成功监测了小湾坝基开挖及混凝土压重状态下的岩体卸荷变形,探测卸荷裂隙分布和张开位移量,定量分析了坝基卸荷岩体变形发展规律,为评价坝基岩体质量和调整坝基岩体力学参数提供了依据,可供类似工程参考。 This paper introduced the principle of the Swiss made sliding micrometer of high precision and its successful application to Xiaowan project in monitoring the deformation due to the rebounding heave in foundation excavation and the ensuing burdening of concrete. The scope of relaxation and distribution of deformation was obtained and the results were used to assess the quality of the rock foundation and adjust the parameters of the stability analysis of the arch dam.
出处 《地下空间与工程学报》 CSCD 2006年第6期1014-1018,1024,共6页 Chinese Journal of Underground Space and Engineering
关键词 坝基岩体 卸荷变形 滑动测微计 监测 小湾电站 rock mass of dam foundation deformation sliding micrometer monitoring Xiaowan hydropower station
  • 相关文献

参考文献3

  • 1赵华,董泽荣,黄仕俊,等.小湾电站边坡安全监测工程成果分析报告[R].小湾水电站边坡安全监测工程项目部,中国水电顾问集团昆明勘测设计研究院科研分院,2006.1.20
  • 2陈光明,刘东勇,薛芝龙,贺湘军,等.小湾水电工程拱坝坝基开挖卸荷松弛影响及工程措施专题报告[R].中国水电顾问集团昆明勘测设计研究院,2006.4
  • 3K·科瓦里.大坝岩基中结构缺陷的探察与监测[R]

共引文献2

同被引文献60

引证文献7

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部