通过统筹考虑设计方案和施工方案、科学合理地安排施工过程中的工序衔接,顺利地实施了运行中66kV/10.5kV/6.3kV总降压变电站扩建工程中的66kV母线接引,既完成了施工任务,又保障了电气系统和工艺生产装置的的安全稳定运行。
Implemented the bus connection in a 66kV/10.SkV/6.3kV step-down substation enlargement engineering by planning the designing methods and the installation methods as a whole and arranging the installation steps of contractors in a scientific sequence while the step-down substation was in running status. So finished the construction tasks and at the same time the safety and stabilization of the power supply system and the process plants were guaranteed.