摘要
通过深入分析高速列车动力集中与动力分散两种动力配置方式的特点。
Locomotive whth 25 t axleload is for fast speed heavy haul,design of which bogie shall be paid special attention to ,so that the wheel rail interaction can be reduced and adhesion be fully utilized.The paper discusses the specific structure design of the bogie and present some proposals.
出处
《机车电传动》
北大核心
1996年第6期1-4,共4页
Electric Drive for Locomotives
关键词
高速列车
电动车组
动力分散方式
adhesion, heary haul train, suspension, axleload, bogie.