3Shaikh, Muzaffar A. A peak shaving approach to project staff reallocation[J]. Computers & Industrial Engineering, 1998, 35 (1-2): 129-132.
4Chan W T, Daviad K H. Construction resource scheduling with genetic algorithms [J]. Jourual of Construction Engineering and Management, ASCE, 1996, 122(2): 125-132.