摘要
湖南常吉高速公路殿会坪隧道出口地质情况复杂,偏压严重,半明半暗及半隧半路段施工过程中出现坡面溜坍、山体持续位移等险情,文章通过介绍其处理和施工过程,就复杂地质条件下双连拱隧道半明半暗、半隧半路段的施工顺序、工艺及方法、特殊情况的处理等作了较为详尽的说明,并提出了相关看法和建议。
Because of complex geologic situation and serious bias of Dianhuiping tunnel exit ,it appears dangerous situation such as hillside landslide, hillbody continual displacement in the course of construction of half bright and half dark, half tunnel and half road construction. Through introducing the process of disposal and construction, the author gave a exhaustive explain, and brought forward correlative opinion about the construction order, technique, method, disposal to especial situation of half bright and half dark, half tunnel and half road section of double connective arch tunnel under complex geologic situation.
出处
《企业技术开发》
2006年第12期6-9,35,共5页
Technological Development of Enterprise
关键词
连拱隧道
复杂地质
半明半暗
半隧半路
施工
connective arch tunnel
complex situation
half bright and half dark
half tunnel and half road
construction